CHARM FACILITY STATUS

Charm Website
Current configuration

Door:

Target:

Target:

Began at:

2018-06-13 16:05

SHIELDING
Concrete (target side)
Iron (target side)
Iron (far side)
Concrete (far side)

Configuration:

Integrated POT (MSC01.ZT8.107:COUNTS*cal_factor integrated over time)